+38 (044) 300-17-71+38 (044) 300-17-61

News

July 3, 2019

Prospect Friendship of Peoples

Installation of piles-barrettes.

Our works involve installation of piles-barrettes 35m in depth. This is a kind of bored piles with increased load bearing capacity due to a complex configuration. At present, we are pouring concrete over the platform for installing a special stand for the manufacture of volume prefabricated reinforcement cages of 15 ... 20 m long. We are installing a mini-plant to produce a bentonite slurry and are making fore shafts for the piles.

Here are the processes in the photos.