+38 (044) 300-17-71+38 (044) 300-17-61

News

January 14, 2019

Small Report from Large Construction Site

Winter is not the best time to build, yet not an obstacle.

Holidays, snow and frost did not become a hindrance to a good pace of construction of the Medical Center “OBERIH”. With every passing day the facility commissioning is coming close. And today, works are in full swing in all directions: these are facade works, and erection of enclosing structures, and laying of service lines both inside and outside the building. Installation of metal structures manufactured at our plant “STALTECH” has been completed. The work is humming in all corners of the large building. When you go down to the underground part, and these are three floors, it’s no wonder if one gets lost. Everywhere people are sawing, drilling, carrying, installing - they will not let you get lost. Despite weather conditions, roofing works are performed – modern technology makes possible to do that. It’s impossible to describe everything, it’s better to take a look at the photos: